Building materials

Freight going to places that are frequently not addresses yet. Open deck, securement and a driver who can work a site rather than a dock.

What this freight actually demands

Three things that decide whether it goes well

01

Job sites are not docks

There is often no forklift, no dock, and no one on site after 3pm. Unloading method has to be agreed before dispatch, not discovered on arrival.

02

Tarping is a real cost

Whether a load is tarped changes the rate, the loading time and which drivers accept it. Steel that must arrive dry is a different job from steel that need not.

03

Delivery windows move

Construction schedules slip, and a truck sitting on a site accrues detention. We would rather build float into the plan than bill you for waiting.

Equipment and service mapping
Primary equipmentFlatbed and step deck
OversizeSpecialized and overdimensional
Typical serviceFlatbed and specialized
SecurementChains, binders, edge protection and tarps as the load requires

Height is the thing people get wrong

Total height is measured from the road, not from the deck. A 60 inch flatbed deck leaves roughly 8 ft 6 in of legal freight height. Measure the freight alone and you will find out at the first bridge.

Permits are lead time

Anything past legal dimensions needs state by state permits, and some states take days. If the schedule does not allow for it, the load moves later. We will say so on the first call.